SAAB WIS ONLINE

INSTALLATION

INSTALLATION

Install the master cylinder to body, and connect the clutch pipe to master cylinder.

Note

Check that the pipe is routed properly.


Tightening torque:

T1: 15 Nm (1.5 kgf-m, 10.8 ft-lb)

T2: 18 Nm (1.8 kgf-m, 13.3 ft-lb)


Connect the push rod of master cylinder to clutch pedal, and install the clevis pin and snap pin.

Note

Apply grease to the clevis pin.



(A)

Clevis pin

(B)

Snap pin

(C)

Push rod



After bleeding air from the clutch system, ensure that clutch operates properly.



Install the air intake chamber (Saab 9-2X 2.5i Linear).

Install the intercooler (Saab 9-2X 2.0T Aero).