SAAB WIS ONLINE

PRE-RELEASE

Knock Sensor Installation - Bank 1

Knock Sensor Installation - Bank 1



1.
Note

The knock sensor connector must be oriented parallel to oil pan rail.


Install the knock sensor bank 1 (2).


2. Refer to Fastener Caution .

Install the knock sensor bolt row 1 (1) and tighten to 23 Nm (17 lb ft) .


PRE-RELEASE