SAAB WIS ONLINE

PRE-RELEASE

Timing Chain Idler Sprocket Installation - Left Side

Timing Chain Idler Sprocket Installation - Left Side



1. Ensure that the timing chain idler sprocket bank 1 (1) is being installed. The recessed hub (3) and the larger sprocket of the timing chain idler sprocket bank 2 is installed outward. The raised hub and the smaller sprocket of the timing chain idler sprocket 2 is installed towards the block.


2. Install the timing chain idler sprocket (2).


3. Refer to Fastener Caution .

Install the timing belt idler pulley bolt (1) and tighten to 58 Nm (43 lb ft) .


PRE-RELEASE