SAAB WIS ONLINE

PRE-RELEASE

Secondary Timing Chain Guide Installation - Right Side

Secondary Timing Chain Guide Installation - Right Side



1. Ensure that the secondary timing chain guide bank 1 (1) is being installed.


2. Install the secondary timing chain guide (1).


3. Refer to Fastener Caution .

Install the 2 secondary timing chain guide bolts (2) and tighten to 23 Nm (17 lb ft) .


PRE-RELEASE